4th Orbit | Beverly Hills Hotel
165
portfolio_page-template-default,single,single-portfolio_page,postid-165,ajax_fade,page_not_loaded,,vertical_menu_enabled, vertical_menu_transparency vertical_menu_transparency_on,qode-theme-ver-7.8,wpb-js-composer js-comp-ver-5.5.4,vc_responsive

Beverly Hills Hotel

About This Project

 

 


Rooms: 208

5-Star

The Beverly Hills Hotel was an extensive remodel, allowing us to incorporate much of their existing content delivery and IP infrastructure. We delivered a very clean lighting, climate and AV control system that tied into their existing PMS and ticketing system to give a full energy management solution.