4th Orbit | Montage Beverly Hills
167
portfolio_page-template-default,single,single-portfolio_page,postid-167,ajax_fade,page_not_loaded,,vertical_menu_enabled, vertical_menu_transparency vertical_menu_transparency_on,qode-theme-ver-7.8,wpb-js-composer js-comp-ver-5.5.4,vc_responsive

Montage Beverly Hills

About This Project

 


Rooms: 201

5-Star

Montage was an existing Control4 install from inception (2008). Commissioned to design, install and program a site wide system update to new hardware and software and employ more aggressive energy management methodologies. A full Crave concierge tablet integration to the Control4 system was deployed.